The job isn't done until the chair is in the room

Most design software stops at the approved proposal, and the problems start after it. How to track every piece from purchase order to receiving to install day.

Install day is the day every approved piece has to be standing in the client's room, and it is the part of a design job most software never sees. The proposal is approved. The invoice is paid. In most design tools, that is the end of the story.

For the person running the project, it is closer to the middle. Fourteen pieces are now on order from six vendors. They will arrive over five weeks, at a receiving dock or a garage or a storage unit. One will be damaged. One will be the wrong finish. One will sit behind another client's dining table until someone remembers it exists the morning of the install.

The design was the easy part to keep track of. The objects are harder.

Where do projects go wrong after the proposal is approved?

At one of four points, and rarely on install day itself. Install-day problems start weeks earlier:

  • Ordering. Something approved never got ordered, or got ordered twice, because the order was re-typed from the proposal by hand.
  • Receiving. A box arrived and nobody opened it. The damage is discovered when the piece is unwrapped in the client's home.
  • Storage. The piece is here, somewhere. Finding it takes an hour and two phone calls.
  • Delivery. The truck is loaded from memory, and the lamp for the primary bedroom stays on the shelf.

Each of these is a tracking problem, not a design problem. And each is usually handled in a spreadsheet, a notes app, or someone's head.

What does it take to track one piece?

Five facts, available at any moment: whether it has been ordered, from whom, whether it has arrived, what condition it arrived in, and where it is sitting right now. Following one chair from "approved" to "in the room" means knowing all five. Multiply that by every item on every active project and the spreadsheet stops keeping up.

How does Qurate follow a piece from order to room?

Qurate treats the approved product as the thing being tracked, from approval through to delivery, so each of those five facts has a place to live.

Purchase orders from the approved design. When a client approves a concept, Qurate can raise the purchase orders for it, grouped one per vendor, with quantities and your cost filled in from your product library. You can email an order to the vendor from the same screen.

Receiving with a record. As shipments come in, you log each one against its order: how many arrived, in what condition, with its dimensions. Damage is flagged at the dock, while there is still time to do something about it.

A label on every piece. Qurate prints QR labels sized for thermal label printers such as the Zebra GK420t. Each label ties the box in front of you to its product and its project, without opening it.

A location for everything. Received items are shelved by building, room, and shelf. "Where is the Hendersons' ottoman?" has an answer you can look up.

One calendar for arrivals and installs. Expected deliveries, project dates, and installs sit on the same planning calendar, so a late shipment shows up as a problem before the install date does.

Deliverables per project. Each project has a list of what the client is owed and where each item stands, from awaiting payment to delivered.

What happens when a shipment is partial, damaged or wrong?

The order stays open until every unit is in, and the record says why. These are the cases that break a spreadsheet, so they are worth spelling out:

  • Partial shipments. Four dining chairs were ordered and two arrived. You log two received against the order; the other two stay expected, and the project's deliverables show two of four in hand instead of a single tick that hides the gap.
  • Damage. A dresser arrives with a cracked drawer front. It is logged as received and damaged, with the dimensions and a note, and it goes to a claims area rather than onto the project's shelf. The vendor conversation starts the same day, not on install morning.
  • Wrong finish. A piece that is the wrong item is received as returned, so it never counts toward the client's deliverables, and a replacement can be ordered without losing the paper trail of the first one.
  • A piece that moved. If the ottoman is reshelved to make room, its location is updated when it is scanned, so the answer to "where is it" is never last week's answer.

How does this work for inventory that goes out more than once?

A rentable product shows which active projects it is out on right now. Stagers and event designers have a second version of the tracking problem: the same sofa goes out to a listing, comes back, and goes out again. In Qurate a product can be for sale, for rent, or both, and a rental piece's record lists the projects it is currently deployed to. That is the difference between knowing you own twelve dining chairs and knowing that eight are at the Maple Street listing until the 14th and four are on the shelf.

How do you know if your tracking is working?

Pick one item from a project you have in progress and try to answer, without calling anyone:

  1. Has it been ordered, and on which order?
  2. Has it arrived, and was it checked?
  3. Where is it right now?
  4. What date is it going to the client?

If that takes more than a minute, the tracking is living in people's heads, and it will be tested on the busiest day of the project.

The approved design is a promise. The job is finished when the last piece of it is standing in the room.